Installing A Zs3-2 Cable Management Arm - Oracle ZFS Installation Manual

Hide thumbs Also See for ZFS:
Table of Contents

Advertisement

Installing a ZS3-2 Cable Management Arm

5.
The following graphic illustrates the chassis insertion and slide rail locks usage.
Installing a ZS3-2 Cable Management Arm
Use the following procedure to install the optional cable management arm (CMA) on a ZS3-2
controller.
Unpack the CMA and identify its components.
Before You Begin
To prepare for installing the optional cable management arm (CMA), follow these guidelines:
Route cluster cables, long-term host cables (including InfiniBand, Fibre Channel, and
Ethernet Cables) and up to 12 disk shelf SAS cables through the CMA.
Do not route short SAS daisy chain cables through the CMA. Do not route an excess of
cables such that the CMA clamps bow or appear structurally unfit to support the weight.
If using two clustered controllers mounted in the middle of the rack with disk shelves
located above and below them, you can divide the disk shelf SAS cables between the two
CMAs so they properly route to the upper and lower disk shelves.
If later removing the CMA, be sure to support it as you remove the connectors.
If the CMA has flat cable covers (for a 1U chassis), install the 2U round cable
1.
covers provided in the accessory kit.
2.
To replace the flat cable covers:
a.
Remove each flat cable cover by lifting up on the cable cover handle.
192
Oracle ZFS Storage Appliance Installation Guide, Release OS8.8.x • August 2021

Advertisement

Table of Contents
loading

Table of Contents