Oracle ZFS Installation Manual page 232

Hide thumbs Also See for ZFS:
Table of Contents

Advertisement

Powering On a DE3-24 or DE2-24 Disk Shelf
Ensure that the power source is easily accessible because the power cord is the main
disconnect device for the disk shelf.
1.
Plug a power cord into each power supply with fan module.
2.
Plug the other end of the power cords into the external power source for the
cabinet.
Note -
independent power sources.
Supply power to the external power source.
3.
4.
Place the power supply on/off switches to the "I" on position.
5.
Turn on the cabinet circuit breakers, if applicable.
6.
After the disk shelf powers on, which could take several minutes, ensure that
the system power indicator on the front of the disk shelf is lit a steady green,
and that each power supply with fan module status indicator on the rear is lit a
steady green.
If not, reseat the faulted module after powering off the disk shelf as described in
a Disk Shelf" on page
reinsertion and powering on, contact Oracle Customer Service.
Related Topics
"Powering Off a Disk Shelf" on page 235
232
Oracle ZFS Storage Appliance Installation Guide, Release OS8.8.x • August 2021
To guarantee redundancy, power cords must be connected to two separate and
235. If the module status indicator is not a steady green after module
"Powering Off

Advertisement

Table of Contents
loading

Table of Contents