Oracle ZFS Installation Manual page 142

Hide thumbs Also See for ZFS:
Table of Contents

Advertisement

Installing a ZS7-2 Cable Management Arm
a.
Align connector C with the slide-rail so that the locking spring (callout 1) is
positioned inside (controller side) of the right slide-rail [frame 1].
Callout
1
Insert connector C into the right slide-rail until it locks into place with an
b.
audible click [frames 2 and 3].
Gently tug on the right side of the CMA back slide bar to verify that
c.
connector C is properly seated.
142
Oracle ZFS Storage Appliance Installation Guide, Release OS8.8.x • August 2021
Description
Connector C locking spring

Advertisement

Table of Contents
loading

Table of Contents