Verifying Operation of ZS5-2 Slide-Rails and CMA

Note -
around any of the CMA components; otherwise, expansion and contraction of the CMA slide
bars might be hindered when the server is extended from the rack and returned to the rack.
Verifying Operation of ZS5-2 Slide-Rails and CMA
Use the following procedure to verify the operation of the CMA and slide rails for a ZS5-2
controller.
Ensure all rack anti-tilt devices are extended to prevent the rack from tipping forward when the
Before You Begin
storage controller is extended from the rack.
1.
Slowly pull the storage controller out of the rack until the slide-rails reach their
stops.
2.
Inspect the attached cables for any binding or kinks.
Verify that the CMA extends fully with the slide-rails.
3.
4.
Push the storage controller back into the rack and verify that the CMA retracts
without binding.
Adjust the cable straps and the CMA, as required.
5.
174
Oracle ZFS Storage Appliance Installation Guide, Release OS8.8.x • August 2021
If you need to install additional Velcro straps, wrap the straps around the cables only, not

Advertisement

Table of Contents
loading

Table of Contents