Wiring Requirements For The Synchronization Connection; Synchronization Connection Process - Ingeteam INGECON SUN PowerMax TL B Series Installation And Operation Manual

Table of Contents

Advertisement

Ingeteam

13.3. Wiring requirements for the synchronization connection

Use the cable supplied by Ingeteam.

13.4. Synchronization connection process

1.
Open the folding door of the DCAC connections module.
2.
Connect the fibers in the synchronization cards following the diagrams displayed in section "13.4.1.
Configuring the synchronization". The wiring is lead through the ducts available up to the wiring accesses.
3.
Leading the fiber optics cables through the packing glands, closing them properly and making sure
they´re sealed.
4.
Close the folding door of the DCAC connections module.
88
Connection of the DCAC connections module
ABQ2026IQE01_A - Installation and Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents