Ingeteam INGECON SUN PowerMax TL B Series Installation And Operation Manual page 42

Table of Contents

Advertisement

Ingeteam
With bottom cover
2189 N
1930 N
300
Footings
Compulsory support points
Optional support points
Area sealed for DC supply
CAUTION
Seal the area indicated in the previous figure to stop water, humidity and other foreign bodies from entering.
You must follow the following stipulations when choosing the place where the unit is to be bolted in:
Minimum distance from the center of the bore to the edge of the concrete pad: 72 mm.
Diameter of the hole drilled in the concrete pad: 10 mm.
Minimum depth of the hole drilled in the concrete pad: 65 mm.
Minimum thickness of the concrete pad: 100 mm.
Minimum depth of anchoring bolt: 45 mm.
Minimum tensile strength: 6.3 kN.
Minimum shear strength: 8.2 kN.
42
4363 N
899
4025 N
998
2739
300
841
ABQ2026IQE01_A - Installation and Operation Manual
Preparation for installing the unit
Top view
3225 N
3010 N
300

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents