17. Configuring the optional DC input current monitoring kit

The main function of the kit is to permanently monitor the current flowing through each multiple input in the
inverter, in order to detect abnormal currents due to faults in the PV array and/or protection elements (fuses).
For its correct operation the Modbus node must be configured. This configuration is done in the kit's control card
(-TMD in the following figure).

17.1. Configuring the Modbus node

This kit is assigned node number 2 by default. In the event that you want to modify this node number, you must
configure the switch in the card according to the following table, taking into aware that position 8 must always be
set to 1:
Node number
001
002
112
-TMD
1
2
3
1
0
0
0
1
0
Configuring the optional DC input current monitoring kit
Switch
4
5
6
0
0
0
0
0
0
ABQ2026IQE01_A - Installation and Operation Manual
7
8
0
1
0
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents