Preparation For Installing The Unit; General Requirements For Installation - Ingeteam INGECON SUN PowerMax TL B Series Installation And Operation Manual

Table of Contents

Advertisement

Preparation for installing the unit

6. Preparation for installing the unit
When deciding the location of the unit and planning your installation, you must follow a set of guidelines based on
the specifications of the unit.
This chapter summaries the guidelines and details the external elements needed for correct operation of the unit.

6.1. General requirements for installation

The work space must be suitable for maintenance tasks according to current regulations.
The external connection devices must be suitable and sufficiently close as set forth in current regulations.
The supply cables must have a gauge suitable to the maximum current and working conditions.
Special care must be taken to ensure that there are no external elements near the air inlets and outlets
that obstruct proper cooling of the unit.
This manual does not supersede any laws, regulations or codes applicable to the installation or the use of
the unit, whether local, state, provincial, federal or national, including electrical safety codes.
Installations must be in accordance with laws, regulations, codes and standards applicable in the
jurisdiction of the location. Ingeteam accepts no liability for the compliance or non-compliance with these
laws, regulations, codes and standards.
The unit contains no user-serviceable parts.
Before installing or using the unit, read all the instructions and warnings in this manual.
Before connecting the unit to the grid, contact the power company. This connection can only be made by
qualified personnel.
The equipment's connection may only be done by qualified personnel.
ABQ2026IQE01_A - Installation and Operation Manual
Ingeteam
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents