Ingeteam INGECON SUN PowerMax TL B Series Installation And Operation Manual page 90

Table of Contents

Advertisement

Ingeteam
Synchronization of two inverters
To perform the synchronization of two inverters wired according to the following diagram, using the fiber optics
provided by Ingeteam.
Master
1
1-2
a b c
1
d e
Inverter internal wiring
Wiring to do by installer
If an incident on the master inverter (1) on the slave inverter (2) disconnect the fiber optics cable 1-2 from the
connector 2.e and configure this inverter as master via its synchronization card switch.
90
Slave
2
a b c
2
d e
Connection of the DCAC connections module
ABQ2026IQE01_A - Installation and Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents