Installing The Unit; Fixing The Unit To The Floor; Opening The Ventilation System Protections - Ingeteam INGECON SUN PowerMax TL B Series Installation And Operation Manual

Table of Contents

Advertisement

Installing the unit

7. Installing the unit
Before installing the unit, you must remove the packaging, taking special care not to damage the housing.
Check that there is no moisture inside the packaging. If there are signs of moisture, you must not install the unit
until you are sure it is completely dry.
CAUTION
All installation operations must comply with current regulations.
Before carrying out the installation, take into account the instructions in section "6. Preparation for installing
the unit".

7.1. Fixing the unit to the floor

To fasten the inverter, bolt a series of bolts to the ground via the dedicated holes on the lower base.
Follow these steps:
1.
Mark the fixing points on the floor.
2.
Drill the ground with a proper bit.
3.
Bolt through the base's holes.
4.
Check that the unit properly secured.

7.2. Opening the ventilation system protections

CAUTION
The ventilation system protection must remain open whenever the unit is running. Failing to do this may cause
faults.
Ingeteam accepts no liability for the consequences of non-compliance with this warning.
Before starting the connections, the ventilation system protections must be opened. To do this, take the following
steps:
ABQ2026IQE01_A - Installation and Operation Manual
Ingeteam
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents