Installing The Unit; General Requirements For Installation; Opening The Housing; Fastening The Combiner Box To The Wall - Ingeteam INGECON SUN 3Play TL U M Installation Manual

Combiner box
Table of Contents

Advertisement

Ingeteam

5. Installing the unit

Before installing the unit, you must remove the packaging, taking special care not to damage the housing.
Check that there is no condensation inside the packaging. If there are signs of condensation, the unit must not be
installed until you are sure it is completely dry.
All installation operations must comply with current regulations.
All operations involving moving heavy weights must be carried out by two people.

5.1. General requirements for installation

The environment of the unit must be appropriate and meet the guidelines described in Chapter "4.
Preparation for installing the unit". Additionally, the parts used in the rest of the installation must be
compatible with the unit and comply with the applicable legislation.
Ventilation and the space for work must be suitable for maintenance tasks according to the applicable
regulations in force.
The external connection devices must be suitable and sufficiently close as set forth in current regulations.
The feed cables must be of the appropriate gauge for the maximum current.

5.2. Opening the housing

To install the combiner box, firstly it is necessary to open the housing. Remove the six front screws to open the
housing.

5.3. Fastening the combiner box to the wall

The combiner boxes can be installed in two different ways: next to inverter or separated from it. The installation
processes for each cases are described below.
14
Installing the unit
ABI2014IQM03_ - Installation manual

Advertisement

Table of Contents
loading

Table of Contents