Download Print this page

KidKraft ASHBERRY Installation And Operating Instructions Manual page 62

Advertisement

Step 25: Attach Hand Grips and Wall Board to Fort
Pre-drill all holes using a 3/16" drill bit before installing the Lag Screws
A: Measure 6-1/2" up from the floor boards on (2153) Post then attach 1 Hand Grip with 2 (LS1) 1/4 x 1-1/2" Lag
Screws (with flat washer). (fig. 25.1 and 25.2)
B: Attach a second Hand Grip to (1205) CE Access Wall using the bolt holes, with 2 (H0) 1/4 x 1" Hex Bolt (with
lock washer, flat washer and t-nut). (fig. 25.2)
C: Flush to the bottom of (2125) Middle Front and centred between the arches of (2145) Back Top, as shown
in fig. 25.1, attach (0850) CE Wall Board with 4 (S1) #8 x 1-1/8" Wood Screws. Bevelled edge faces down and
towards inside of fort. (fig. 25.2 and 25.3)
Fig. 25.2
1205
Hand
Grip
1/4"
t-nut
1/4" lock
1/4" flat
washer
washer
Wood Parts
1 x
CE Wall Board 1 x 4 x 17"
0850
Arches
2145
0850
H0
Hardware
LS1
2 x
1/4 x 1-1/2" Lag Screw (1/4"flat washer)
2 x
H0
1/4 x 1" Hex Bolt (1/4" lock washer, 1/4" flat washer, 1/4" t-nut)
4 x
#8 x 1-1/8" Wood Screw
S1
2153
2125
1/4" flat
washer
LS1
x 2
Hand Grip
6-1/2"
Bevelled edge
facing down and
towards inside of
fort
62
Fig. 25.1
Fig. 25.3
2145
0850
2125
S1
x 4
Flush
View from inside
Other Parts
2 x Hand Grips

Hide quick links:

Advertisement

loading

This manual is also suitable for:

F23075