2.7 Installing cables

Connect the interconnection cable first to the wire feeder and then to the power source. For the connector descriptions
and their locations, refer to "X5 Wire Feeder 200" on page 10 or "X5 Wire Feeder 300" on page 14 (depending on your
wire feeder model).
Connecting interconnection cable to wire feeder
1.
Open the cable cabinet hatch to reveal the connectors.
2.
Connect the welding current cable (3) to the wire feeder. Push the cable as far as it goes and turn the connector
clockwise to tighten the cable to its place.
Tighten the welding current cable as much as you can by hand. If the welding current cable connection is loose, it
may overheat.
3.
Push the shielding gas hose (1) to the shielding gas hose connector so that it locks down.
4.
Connect the control cable (2) to the connector. Rotate the collar clockwise to lock it in place.
5.
If you have the optional cooling unit, place the cooling liquid hose connectors (4, 5) into the slot and through the
aperture.
>> Compress the spring fastener to get the hose connectors in place. Once released, ensure that the spring
fastener locks in place into the hose connector grooves.
6.
Secure cable strain relief.
>> X5 Wire Feeder 200: Place the cable to the slot on the wire feeder and secure it in place by closing the hatch