Pre-start Check List

6 Pre-start Check List
Before completing installation of the unit, inspect the entire installation as detailed in Table 6.1. Check and mark the items
when completed.
Inspect for
Description
Motor
Confirm continuity of the motor by measuring ohm values on U–V (96–97), V–W (97–98), and W–U (98–96).
Confirm that the supply voltage matches the voltage of the drive and the motor.
Switches
Ensure that all switch and disconnect settings are in the proper positions.
Auxiliary equipment
Look for auxiliary equipment, switches, disconnects, or input fuses/circuit breakers that reside on the input
power side of the drive or output side to the motor. Ensure that they are ready for full-speed operation.
Check function and installation of any sensors used for feedback to the drive.
Remove any power factor correction caps on motor.
Adjust any power factor correction caps on the mains side and ensure that they are dampened.
Cable routing
Ensure that motor wiring, brake wiring (if equipped), and control wiring are separated or shielded, or in 3
separate metallic conduits for high-frequency interference isolation.
Control wiring
Check for broken or damaged wires and loose connections.
Check that control wiring is isolated from high-power wiring for noise immunity.
Check the voltage source of the signals, if necessary.
Use shielded cable or twisted pair and ensure that the shield is terminated correctly.
Input and output
Check for loose connections.
power wiring
Check that motor and mains are in separate conduit or separated shielded cables.
Grounding
Check for good ground connections that are tight and free of oxidation.
Grounding to conduit, or mounting the back panel to a metal surface, is not a suitable grounding.
Fuses and circuit
Check for proper fusing or circuit breakers.
breakers
Check that all fuses are inserted firmly and are in operational condition and that all circuit breakers (if
used) are in the open position.
Cooling clearance
Look for any obstructions in the airflow path.
Measure top and bottom clearance of the drive to verify adequate airflow for cooling, see
chapter 4.5 Installation and Cooling Requirements.
Ambient conditions
Check that requirements for ambient conditions are met. See chapter 10.4 Ambient Conditions.
Interior of the drive
Inspect that the unit interior is free of dirt, metal chips, moisture, and corrosion.
Verify that all installation tools have been removed from unit interior.
For D3h and D4h enclosures, ensure that the unit is mounted on an unpainted, metal surface.
Vibration
Check that the unit is mounted solidly, or that shock mounts are used, if necessary.
Check for an unusual amount of vibration.
Table 6.1 Pre-start Check List