Signatures; Installer; Customer Representative; Final Documentation - Micromeritics Gemini VII 2390 Confirm Installation Instructions And Checklist

Hide thumbs Also See for Gemini VII 2390 Confirm:
Table of Contents

Advertisement

Signatures

Signatures

Installer

Name:
(please print)
Position:
Company:

Customer Representative

Name:
(please print)
Position:
Company:

Final Documentation

In order to provide consistent instrument service, Micromeritics retains records of installation,
operational verification, and calibration data in its Service Support Center in Norcross,
Georgia, USA. After completing the installation process, representatives of Micromeritics
who install instruments are required to send the documents listed below to Micromeritics for
inclusion in the customer's instrument history.
The documents to be sent to the Micromeritics Service Support Center are:
Completed Field Service Report
Completed and signed, Gemini VII 2390 Installation Checklist:
Blank Tube Analysis Sample Files.
Reference Material Analysis Sample Files.
Calibration files if calibration data were changed during installation.
74
Gemini VII 2390 Confirm Installation Instructions and Checklist
Signed:
Date:
Field Service Report (FSR Number):
Signed:
Date:
Field Service Report (FSR Number):
Gemini VII 2390 Confirm
Feb 09

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Gemini VII 2390 Confirm and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents