Preparing For Installation; Connecting Cables; Installing The Vacuum Pump; Entering Ethernet Settings - Micromeritics Gemini VII 2390 Confirm Installation Instructions And Checklist

Hide thumbs Also See for Gemini VII 2390 Confirm:
Table of Contents

Advertisement

Preparing for Installation

Preparing for Installation
Review the Preinstallation Instructions and Checklist and ensure that the
laboratory is prepared for installation.
Ensure that the required personnel are available.
Ensure that all equipment has been unpacked and verified using the
packing list.

Connecting Cables

Connect the power cord to the analyzer and to a power source.
Connect the ethernet cable to the analyzer and to the computer.

Installing the Vacuum Pump

Install the components of the vacuum pump, including oil (if applicable).
Connect the vacuum pump to analyzer.
Plug in the vacuum pump.
Turn on the vacuum pump switch (if applicable).
Turn on the analyzer power switch.

Entering Ethernet Settings

Enter the ethernet settings.
Configure the firewall setting.
70
Procedure
Procedure
Procedure
Procedure
Gemini VII 2390 Confirm Installation Instructions and Checklist
Gemini VII 2390 Confirm
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
P
F N/A
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
P
F N/A
P
F N/A
P
F N/A
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
Feb 09

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Gemini VII 2390 Confirm and is the answer not in the manual?

Questions and answers

Table of Contents