Preparing for Installation
Preparing for Installation
Review the Preinstallation Instructions and Checklist and ensure that the
laboratory is prepared for installation.
Ensure that the required personnel are available.
Ensure that all equipment has been unpacked and verified using the
packing list.
Connecting Cables
Connect the power cord to the analyzer and to a power source.
Connect the ethernet cable to the analyzer and to the computer.
Installing the Vacuum Pump
Install the components of the vacuum pump, including oil (if applicable).
Connect the vacuum pump to analyzer.
Plug in the vacuum pump.
Turn on the vacuum pump switch (if applicable).
Turn on the analyzer power switch.
Entering Ethernet Settings
Enter the ethernet settings.
Configure the firewall setting.
70
Procedure
Procedure
Procedure
Procedure
Gemini VII 2390 Confirm Installation Instructions and Checklist
Gemini VII 2390 Confirm
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
P
F N/A
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
P
F N/A
P
F N/A
P
F N/A
Evaluation
Initial/
Code
Date
P
F N/A
P
F N/A
Feb 09
Need help?
Do you have a question about the Gemini VII 2390 Confirm and is the answer not in the manual?
Questions and answers