Installing the Vacuum Pump
Place the hose flange in the Vacuum port; tighten the two retaining screws with a wrench.
3. Plug the vacuum pump power cord into an appropriate power source.
Applying Power to the Analyzer
1. Place the Gemini VII 2390 analyzer power switch, located on the lower rear panel of the
instrument in the ON position.
Power switch
2. Observe the Power indicator on the upper front portion of the instrument. The indicator
will blink green to indicate that power is applied to the instrument. Once the embedded
application is running, the indicator will stop blinking and remain on.
20
Power indicator
Gemini VII 2390 Confirm Installation Instructions and Checklist
Gemini VII 2390 Confirm
Feb 09
Need help?
Do you have a question about the Gemini VII 2390 Confirm and is the answer not in the manual?
Questions and answers