3. Use a 7/16-in (11-mm) wrench to tighten the nut an additional 1/4 turn.
4. Open the gas line, then apply a leak test agent to the gas port connection to make sure
there is no leak at the fitting. Tighten if needed.
5. Connect the helium to the instrument repeating steps 1-4.