Gemini VII 2390 Confirm
4. Place the hose flange in the Vacuum port; tighten the two retaining screws with a wrench
Applying Power to the Pump
1. Set the voltage on the pump to 115V or 230V to match your environment.
2. Plug the vacuum pump power cord into an appropriate power source
3. Place the high-vacuum pump power switch on the back of the pump enclosure in the
ON ( | ) position.
4. Place the vacuum pump power switch on the front of the pump enclosure in the ON ( | )
position.
Feb 09
Gemini VII 2390 Confirm Installation Instructions and Checklist
Installing the Vacuum Pump
Power switch
Power switch
17
Need help?
Do you have a question about the Gemini VII 2390 Confirm and is the answer not in the manual?
Questions and answers