Preparing For A Reference Material Analysis - Micromeritics Gemini VII 2390 Confirm Installation Instructions And Checklist

Hide thumbs Also See for Gemini VII 2390 Confirm:
Table of Contents

Advertisement

Preparing for a Reference Material Analysis

7. Select Unit [n] > Start Po Measurement from the main menu to display the Po
Measurement dialog.
Choose one of the following:
a. For Gemini VII 2390a units, click
b. For Gemini VII 2390p and 2390t units, click Po tube, then click
8. The application measures the saturation pressure. When the saturation pressure has been
recorded, the dialog closes.
Preparing for a Reference Material Analysis
1. Place the sample weighing support on the balance. Tare the balance and allow it to
stabilize at zero (0).
2. Place the sample tube set (empty sample tube and stopper) on the sample weighing
support, and place it on the balance.
62
Gemini VII 2390 Confirm Installation Instructions and Checklist
This area is shown
for Models 2390p and
2390t only.
Start.
Gemini VII 2390 Confirm
.
Start
Feb 09

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Gemini VII 2390 Confirm and is the answer not in the manual?

Questions and answers

Table of Contents