5
PROCEDURES AND SETTINGS BEFORE
OPERATION
(b) Checking using GX Configurator-PT
Monitor the "current feed value", "current speed", "axis operation status", and
"axis error code" on the [Monitor/Test] screen.
(For details, refer to "Section 6.6 Monitoring/Test".)
(Example) Operation monitor of Axis 1 (Axis #1 Monitor/Test)
(GX Configurator-PT screen)
5.7 Simple Reciprocating Operation
1
2
3
4
5
6
7
8
5
- 21