SMA Sunny Island 5048 Installation Instructions Manual page 59

Hide thumbs Also See for Sunny Island 5048:
Table of Contents

Advertisement

SMA
Technologie AG
System configuration overview:
Displayed text
1phase 1SI PV
1phase 1SI OG
1phase 1SI GB
1phase 2SI PV
1phase 2SI OG
1phase 2SI GB
1phase 3SI PV
1phase 3SI OG
1phase 3SI GB
1phase 4SI PV
1phase 4SI OG
1phase 4SI GB
Three 3SI PV
Three 3SI OG
Three 3SI GB
If you have a system with more than one Sunny Island 5048 device, you must first
run the QCG on the slave(s) before starting the master device (display message
"INIT MASTER OK START?"). Only the device type is set there. Only start the
master device thereafter!
If the "New Battery" option is selected, only specific battery settings are reset and
set to new values. System settings are not affected.
7.
After entering the parameters listed below, the display
of the master shows the following message:
8.
Press <ENTER> to confirm. The following message then
appears on the display.
9.
Press <ENTER>. A beep is heard, the Sunny Island 5048 starts and is operating.
The green (upper) LED is illuminated.
Technical Description
1-phase system, 1 Sunny Island 5048, photovoltaics only
1-phase system, 1 Sunny Island 5048, offgrid + generator
1-phase system, 1 Sunny Island 5048, backup on the grid
1-phase system, 2 Sunny Island 5048 devices, photovoltaics only
1-phase system, 2 Sunny Island 5048 devices, offgrid + generator
1-phase system, 2 Sunny Island 5048 devices, backup on the grid
1-phase system, 3 Sunny Island 5048 devices, photovoltaics only
1-phase system, 3 Sunny Island 5048 devices, offgrid + generator
1-phase system, 3 Sunny Island 5048 devices, backup on the grid
1-phase system, 4 Sunny Island 5048 devices, photovoltaics only
1-phase system, 4 Sunny Island 5048 devices, offgrid + generator
1-phase system, 4 Sunny Island 5048 devices, backup on the grid
3-phase system, 3 Sunny Island 5048 devices, photovoltaics only
3-phase system, 3 Sunny Island 5048 devices, offgrid + generator
3-phase system, 3 Sunny Island 5048 devices, backup on the grid
Meaning
INIT MASTER OK
START?
Standby-To start
press <ENTER>
SI5048-11:EE4206
(First) Commissioning
Page 59