(First) Commissioning
5.
You are now in the Quick Configuration Guide (QCG).
Here you can select the following:
-
"Start System" (if you have accidentally accessed
the QCG and only would like to restart the system)
-
"New System" (if you would like to start a new
system
or
configuration)
"New Battery" (if you would like to change the
-
main battery
configuration)
-
"Emerg Charge" (if you would like to charge a
deeply discharged battery using an external source,
see section 19.9 "Troubleshooting" (Page 150))
The following parameters must be set when "New System" is selected:
6.
-
Voltage/frequency type (230V_50Hz, 220V_60Hz), default is "230V_50Hz"
-
System configuration (for this selection, see "System configuration overview:"
(Page 59)), default setting is "1phase 1SI PV"
-
Device type (Master, Slave1, Slave2, Slave3)
-
Date
-
Time
-
Battery type (VRLA, FLA, NiCd), default setting is "VRLA"
-
Nominal battery capacity (100 to 10000 Ah), default setting is "100 Ah"
-
Nominal battery voltage (44 to 48 V), default setting is "48.0 V"
-
Maximum generator current (0 to 224 A), default setting is "16 A"
-
Generator interface (Manual, GenMan, Autostart), default setting is "Manual"
The following parameters must be set when "New Battery" is selected:
-
Battery type (VRLA, FLA, NiCd), default setting is "VRLA"
-
Nominal battery capacity (100 to 10000 Ah), default setting is "100 Ah"
-
Nominal battery voltage (44 to 48 V), default setting is "48.0 V"
Page 58
SI5048-11:EE4206
perform
changes
settings,
but
to
the
system
retain the
system
SMA
Technologie AG
01#StartMenu
New System
Technical Description

Advertisement

Table of Contents
loading

Table of Contents