Hypertherm HyPrecision Predictive P-15 Operator's Manual page 117

Waterjet pumps
Table of Contents

Advertisement

5 – Preventive maintenance
19. Put the end of the check valve into the seal. Tap on the small end of the check valve with a rubber mallet until
it is touching the cylinder end.
20. Turn the cylinder over so that the check valve is on the bottom. Put 1 hand under the bore at the bottom of the
cylinder to catch the spacer tool and to prevent the spacer tube from sliding out.
21. Use the same procedure to install the second seal and the hoop in the high-pressure cylinder.
22. Put the cylinder and the check valve on to the plunger by pushing on the end of the check valve until the
cylinder is touching the seal housing.
HyPrecision Predictive waterjet pump Operator Manual 810120
117

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HyPrecision Predictive P-15 and is the answer not in the manual?

Table of Contents