5 – Preventive maintenance
Primary maintenance screen
On the operator interface, touch the maintenance symbol to open the primary maintenance screen.
1
Move the plunger
2
Start the pump after maintenance
3
Prepare for storage
Move the plunger
Touch this symbol to open the Move the Plunger screen.
Touch a symbol to manually shift the intensifier plunger to the left or to the right.
The unit must be in cooling mode. The cooling symbol with a hand flashes as a reminder.
Start the pump after maintenance
Touch this symbol to open the Start Procedure screen. Refer to Postmaintenance start procedure
on page 132 for instructions.
128
1
2
3
HyPrecision Predictive waterjet pump Operator Manual 810120
4
5
6
4
Record maintenance
5
Inputs and outputs
6
Alarm log
Need help?
Do you have a question about the HyPrecision Predictive P-15 and is the answer not in the manual?