Unpacking The M120; Tools And Parts Required To Unpack The M120 Router; Unpacking The M120 Router - Juniper M120 Hardware Manual

Multiservice edge router
Hide thumbs Also See for M120:
Table of Contents

Advertisement

CHAPTER 15

Unpacking the M120

Tools and Parts Required to Unpack the M120 Router

Related
Documentation

Unpacking the M120 Router

Copyright © 2018, Juniper Networks, Inc.
Tools and Parts Required to Unpack the M120 Router on page 113
Unpacking the M120 Router on page 113
Verifying M120 Parts Received on page 115
To unpack the router and prepare for installation, you need:
Phillips (+) screwdriver, number 2
1/2-in. or 13-mm open-end or socket wrench to remove bracket bolts from the shipping
pallet
Blank panels to cover any slots not occupied by a component
M120 Router Chassis Description on page 7
M120 Router Installation Summary on page 111
M120 Site Preparation Checklist on page 81
The router is shipped in a cardboard box strapped securely to a wood pallet. Plastic
straps secure the top and bottom in place. The router chassis is bolted to this pallet.
Quick Start installation instructions and a cardboard accessory box are also included in
the shipping container.
The shipping container measures 32.5 in. (82.6 cm) high, 35 in. (88.9 cm) wide, and
27 in. (68.6 cm) deep. The total weight of the container containing the router and
accessories can range from 149 lb (63.5 kg) to 280 lb (127 kg).
NOTE:
The router is maximally protected inside the shipping crate. Do not
unpack it until you are ready to begin installation.
To unpack the router, (see
Figure 28 on page
115):
113

Advertisement

Table of Contents
loading

Table of Contents