Additional Guidelines; Requirements For The Electrical Connections - DeDietrich C 340 Series Installation And User Manual

High-efficiency floor-standing gas boiler with diematic evolution scb-01, diematic evolution scb-10
Table of Contents

Advertisement

4 Preparation of installation
4.6

Requirements for the electrical connections

26
C 340 / C 640
4.5.5

Additional guidelines

Air supply filter
An air supply filter is separately available.
When installing the boiler in a room-ventilated setup (B
It is recommended to install the air supply filter if the boiler is installed in
a dusty room.
It is mandatory to install the air supply filter if the boiler is exposed to
construction dust.
Installation
For installing the flue gas outlet and air supply materials, refer to the
instructions of the manufacturer of the relevant material. After
installation, check at least all flue gas outlet and air supply parts for
tightness.
Warning
If the flue gas outlet and air supply materials are not installed in
accordance with the instructions (e.g. not leak-proof, not correctly
bracketed), this can result in dangerous situations and/or physical
injury.
Make sure that the flue gas outlet pipe towards the boiler has a sufficient
gradient (at least 50 mm per metre) and that there is a sufficient
condensate collector and discharge (at least 1 m before the outlet of the
boiler). The bends used must be larger than 90° to guarantee the
gradient and a good seal on the lip rings.
Condensation
Direct connection of the flue gas outlet to structural ducts is not
permitted because of condensation.
If condensate from a plastic or stainless steel pipe section can flow back
to an aluminium part in the flue gas outlet, this condensate must be
discharged via a collector before it reaches the aluminium.
Newly installed aluminium flue gas pipes with longer lengths can
produce relatively larger quantities of corrosion products. Check and
clean the siphon more often in this case.
Important
Contact us for more information.
Establish the electrical connections in accordance with all local and
national current regulations and standards.
Electrical connections must always be made with the power supply
disconnected and only by qualified installers.
The boiler is completely pre-wired. Never change the internal
connections of the control panel.
Always connect the boiler to a well-earthed installation.
The standard NF C 15,100.
The standard CEI.
The wiring must comply with the instructions in the electrical diagrams.
Follow the recommendations in this manual.
Separate the sensor cables from the 230 V cables
Outside the boiler: Use 2 cables spaced at least 10 cm apart.
Make sure the following requirements are met when connecting the cables
to the CB and SCB connectors:
, B
):
23
23P
7762666 - v.02 - 29092020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents