Requirements For Water Connections; Requirements For The Central Heating Connections; Requirements For The Condensate Drain; Requirements For The Gas Connection - DeDietrich C 340 Series Installation And User Manual

High-efficiency floor-standing gas boiler with diematic evolution scb-01, diematic evolution scb-10
Table of Contents

Advertisement

4.3

Requirements for water connections

4.4

Requirements for the gas connection

7762666 - v.02 - 29092020
C 340
C 640
430
860
500
1000
570
1140
650
1300
Before installation, check that the connections meet the set
requirements.
Carry out any welding work required at a safe distance from the boiler.
If using synthetic pipes, follow the manufacturer's instructions.
4.3.1

Requirements for the central heating connections

We recommend installing a central heating filter in the return pipe to
prevent clogging of boiler components.
4.3.2

Requirements for the condensate drain

The drain pipe must be Ø 32 mm or larger, terminating in the drain.
Use only plastic material for the discharge pipe due to the acidity (pH 2
to 5) of the condensate.
Fit a watertrap or siphon in the drain pipe.
The drain pipe must slope down at least 30 mm per metre, the maximum
horizontal length is 5 metres.
Do not make a fixed connection in order to prevent an overpressure in
the siphon.
Carry out any welding work required at a safe distance from the boiler.
Before installing, check that the gas meter has sufficient capacity. Take
into account the consumption of all appliances. Notify the local energy
company if the gas meter has insufficient capacity.
We recommend installing a gas filter to prevent clogging of the gas
valve unit.
Pipe diameters must be defined in accordance with ATG's (Association
Technique de Gaz) B171 specifications.
4 Preparation of installation
A (mm)
B (mm)
C (mm)
723
1862
2962
1032
2172
3272
1032
2172
3272
1032
2172
3272
C 340 / C 640
19