Fig.36
Fit the air inlet pipe to the boiler
3
5.8
Electrical connections
Fig.37
PCB locations
1 1
3 3
5
6 6
7 7
8 8
Fig.38
Connection PCB CB-01
X5
X4
IN
X2
X9
Pump
X3
N
L
PWM
Pump
N
L
0
+
7762666 - v.02 - 29092020
AD-3001426-02
4 4
2 2
9 9
10
10
AD-3001592-01
X6
S-Bus
OUT
X10
0-10
On/off
Tout
0
+
OT
BL
RL
AD-3000672-03
3. Fit the air supply pipe to the boiler.
4. Fit the subsequent air supply pipes in accordance with the
manufacturer's instructions.
Caution
The pipes must not be resting on the boiler.
Fit the horizontal parts sloping down towards the air supply
outlet.
5.8.1
PCB locations
This illustration shows the location for each PCB. Both factory-fitted and
optional PCBs are shown.
device
CU-GH13
CB-01
SCB-01
SCB-10
SCB-13 (optional)
AD249 (optional)
GTW-08 (optional)
GTW-22
GTW-30 (optional)
5.8.2
The CB-01 connection PCB
The CB-01 is placed in the control box. It provides easy access to all the
standard connectors.
5 Installation
primary location
location option
5
-
1
-
7
8
2
-
4
6
3
-
7
-
10
-
8
9
C 340 / C 640
47