Electrical Connections; Pcb Locations; The Cb-01 Connection Pcb - DeDietrich C 340 Series Installation And User Manual

High-efficiency floor-standing gas boiler with diematic evolution scb-01, diematic evolution scb-10
Table of Contents

Advertisement

Fig.36
Fit the air inlet pipe to the boiler
3
5.8

Electrical connections

Fig.37

PCB locations

1 1
3 3
5
6 6
7 7
8 8
Fig.38
Connection PCB CB-01
X5
X4
IN
X2
X9
Pump
X3
N
L
PWM
Pump
N
L
0
+
7762666 - v.02 - 29092020
AD-3001426-02
4 4
2 2
9 9
10
10
AD-3001592-01
X6
S-Bus
OUT
X10
0-10
On/off
Tout
0
+
OT
BL
RL
AD-3000672-03
3. Fit the air supply pipe to the boiler.
4. Fit the subsequent air supply pipes in accordance with the
manufacturer's instructions.
Caution
The pipes must not be resting on the boiler.
Fit the horizontal parts sloping down towards the air supply
outlet.
5.8.1
PCB locations
This illustration shows the location for each PCB. Both factory-fitted and
optional PCBs are shown.
device
CU-GH13
CB-01
SCB-01
SCB-10
SCB-13 (optional)
AD249 (optional)
GTW-08 (optional)
GTW-22
GTW-30 (optional)
5.8.2

The CB-01 connection PCB

The CB-01 is placed in the control box. It provides easy access to all the
standard connectors.
5 Installation
primary location
location option
5
-
1
-
7
8
2
-
4
6
3
-
7
-
10
-
8
9
C 340 / C 640
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents