Preparation Of Installation; Installation Regulations; Location Requirements - DeDietrich C 340 Series Installation And User Manual

High-efficiency floor-standing gas boiler with diematic evolution scb-01, diematic evolution scb-10
Table of Contents

Advertisement

4 Preparation of installation

4
Preparation of installation
4.1

Installation regulations

4.2

Location requirements

Fig.10
Location requirements
1
2
1 Heat exchanger inspection hatch location
2 Support surface
A Support surface length (see table)
18
C 340 / C 640
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.
Danger
It is forbidden to store, even temporarily, combustible products
and substances in or near the boiler.
Caution
The boiler must be installed in a frost-free area.
An earthed electrical connection must be available close to the
boiler.
A connection to the drain must be present for the condensate
drain close to the boiler.
When choosing the best installation location, consider:
The regulations.
The required installation space.
The required space around the boiler for good access and to facilitate
maintenance.
The permitted position of the flue gas outlet and/or air supply opening.
B Boiler length (see table)
C Total length required (see table)
Tab.5
Dimensions A / B / C (mm)
C 340
C 640
280
560
350
700
2
800
720
150
1670
AD-3001441-01
A (mm)
B (mm)
C (mm)
723
1862
2962
723
1862
2962
7762666 - v.02 - 29092020

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents