Transport; Unpacking/Initial Preparation - DeDietrich 24 Installation And Service Manual

High-efficiency wall-hung condensing gas boiler
Hide thumbs Also See for 24:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 144
en
5 Before installation
Fig.103
Service label
"Code"
"Product name"
"s/n"
Fig.104
Service label position
"Code"
"Product name"
"s/n"
5.5

Transport

Transport the packaged appliance horizontally using a suitable cart. The boiler may be transported vertically using a two-wheel
cart, only for short distances.
Warning
Moving the boiler is a job for two people.
5.6

Unpacking/initial preparation

Caution
Do not grasp the siphon on the drain pipe located underneath the boiler when removing the packaging or lifting the
appliance.
Follow the procedure described below to remove the boiler packaging:
Lift the boiler to a vertical position (1);
Remove the straps and the strip of tape (2)-(3)-(4);
Remove the accessories (5), take the boiler fastening bracket and fasten it to the wall;
Remove the polystyrene by slipping it off upwards (6);
Slip off the cardboard by pulling it upwards (7);
Remove the pre-punched part of polystyrene at the bottom (8);
LIFT the boiler by gripping points "a" and "b" (9);
Hook the boiler onto the wall-mounted bracket (9);
Remove the polystyrene by slipping it off downwards (10).
164
INIDENS
BO-0000012
BO-7726559-3
Gas category used (depends on the country of
II
xxxxx
use).
CN1/CN2
Factory parameters.
s/n
Serial number.
Tab.103 Service label description
"Code"
"Product name"
"s/n"
Product code.
Model name.
Serial number.
7804841 - 02 - 20012022

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

20/24 mi24/28 mi30/35 mi

Table of Contents