Section Two –
Installation Requirements
This section offers an overview of site requirements and how to prepare the unit
for operation.
Prerequisites
Before you install the Logic+, you need to prepare the site for installation.
Examine the location where you intend to install the cabinet. You must be
certain that the area is level and of solid construction. In addition, a dedicated
source of electrical power must be located near the installation site.
Carefully read this chapter to learn:
Location requirements.
Electrical power requirements.
Exhaust requirements.
Service utility requirements.
Space requirements.
Appendix C: Specifications
Refer to
environmental conditions, specifications and requirements
Space Requirements
The dimensions for the Logic+ biosafety cabinets are shown in
Miscellaneous
.
Clearance
A minimum clearance of at least 6 inches (150 mm) is suggested on the top and
both sides of the cabinet for service.
, for complete biosafety cabinet electrical and
Product Service 1-800-522-7658
.
Section Nine:
45
Need help?
Do you have a question about the Purifier Logic+ 30132 and is the answer not in the manual?