Commissioning guide
16 Commissioning guide
16.1 Note
Only trained personnel following the safety regulations may commission the UNIGATE
16.2 Components
You will require the following components to commission the UNIGATE
®
•
UNIGATE
•
Connection cable from gateway to the process
•
Connector for Profibus connection to the Gateway
•
PROFIBUS cable (this cable is generally already installed on site!)
•
10..33 V DC power supply (DIN 19240)
•
Type file or GSD file and user manual (a sample file as well as the user manual can be ordered
separately or downloaded free of charge from our homepage at www.deutschmann.de).
16.3 Installation
®
The UNIGATE
CX-C4Map-PB module features protection type IP20 and is thus suitable for
switch cabinet use. The device is designed for snapping onto a 35 mm DIN-rail..
16.4 Dimensional drawing UNIGATE
16.5 Commissioning
It is essential that you perform the following steps during commissioning in order to ensure that
the module operates correctly:
50
Fieldbus-Gateway UNIGATE
Deutschmann Automation GmbH & Co. KG
®
:
®
CX-C4Map-PROFIBUS DP
®
CX C4Map - PROFIBUS V. 1.0
®
.
28.9.20
Need help?
Do you have a question about the UNIGATE CX-CANopen-(Mapping) - PROFIBUS DP and is the answer not in the manual?