Sign In
Upload
Manuals
Brands
DEUTSCHMANN AUTOMATION Manuals
Gateway
UNIGATE CM - PROFIBUS
DEUTSCHMANN AUTOMATION UNIGATE CM - PROFIBUS Manuals
Manuals and User Guides for DEUTSCHMANN AUTOMATION UNIGATE CM - PROFIBUS. We have
1
DEUTSCHMANN AUTOMATION UNIGATE CM - PROFIBUS manual available for free PDF download: Instruction Manual
DEUTSCHMANN AUTOMATION UNIGATE CM - PROFIBUS Instruction Manual (62 pages)
Universal Fieldbus-Gateway
Brand:
DEUTSCHMANN AUTOMATION
| Category:
Gateway
| Size: 1 MB
Table of Contents
Table of Contents
3
1 Information on CE Marking of the Module
8
EU Directive EMC
8
Scope of Application
8
Note Installation Guidelines
8
Installation of the Unit
8
Working on Switch Cabinets
8
2 Information for the Machine Manufacturers
9
Introduction
9
EU Machinery Directive
9
3 Introduction
10
UNIGATE ® CM Software Flow-Chart
11
UNIGATE ® Block Diagram
12
UNIGATE ® CM Application Diagram
12
4 Operation Modes of the Gateway
13
Configuration Mode (Config Mode)
13
Test Mode
13
Data Exchange Mode
14
5 RS-Interface
15
RS-Interfaces at the UNIGATE ® CM
15
Buffer Sizes at the UNIGATE ® CM
15
Framing Check
15
6 The Debug-Interface
16
Overview of the Debug-Interface
16
Starting in the Debug-Mode
16
Communication Parameter for the Debug-Interface
16
Possibilities with the Debug-Interface
16
Commands of the Debug-Interface
16
7 Mode of Operation of the System
18
General Explanation
18
Interfaces
18
Data Exchange
18
Possible Data Lengths
18
Startup Phase
18
8 Generating a Script
19
What Is a Script
19
Memory Efficiency of the Programs
19
What Can You Do with a Script Device
19
Independence of Buses
19
Further Settings at the Gateway
19
The Use of the Protocol Developer
20
Accuracies of the Baud Rates
20
Script Processing Times
21
9 Hardware Ports, Switches and Leds
22
Device Labeling
22
Connectors
22
Connector to the External Device (RS-Interface)
22
Connector Supply Voltage and DEBUG-Interface
23
Canopen Interface Connector
23
PROFIBUS DP-Connector
23
Power Supply
23
Leds
24
LED "Power/State
24
Leds 1 / 2 / 4 / 8 (Error No. / Select ID)
25
LED "State
25
LED "Bus Power
25
LED "Bus
25
LED "Bus State
26
Switches
26
Termination Rx 422 + Tx 422 (Serial Interface)
26
Rotary Coding Switches S4 + S5 (Serial Interface)
26
Termination (PROFIBUS)
27
Rotary Coding Switches High + Low (PROFIBUS-ID)
27
Canopen Termination
27
10 Error Handling
28
Error Handling at UNIGATE ® CM
28
Error on the Extension
29
11 Installation Guidelines
30
Installation of the Module
30
Mounting
30
Removal
30
Wiring
30
Connection Systems
30
Power Supply
30
Equipotential Bonding Connection
31
PROFIBUS DP Communication Interface
31
Bus Line with Copper Cable
31
Line Routing, Shield and Measures to Combat Interference Voltage
31
General Information on Line Routing
31
Shielding of Lines
32
12 Firmware Update
33
13 Profibus Dp
34
Description of the DPV1-/DPV2-Functions
34
Dpv1
34
Dpv2
34
Representation of the Data in PROFIBUS DP
34
Configuration Telegram
34
Configuration Telegram
35
Diagnosis
35
Diagnosis in DPV1
37
Data Exchange
38
14 Implemented Protocols in UNIGATE ® CM
39
Implemented Protocols (Transport Protocols at the CM Interface)
39
Configuration Options for the Individual Transport Protocol
40
Possibilities on the Canopen Side
40
Possibilities on the Fieldbus Side
40
Operation of the Transport Protocols
41
Canopen Mapping
41
Configuration of the Mapping
41
Node Guarding
42
Displaying the Node Guarding States
43
Emergency Messages
44
Gateway Control Byte
44
Bit 7 (MSB): EMCY Toggle Bit
45
Bit 6: Set Operational Toggle Bit
45
Bit 5: RTR - Request to Response
45
Gateway Error Byte
45
SDO Obj Mapping
45
Slave Mode
47
CAN Baud Rate and Address
47
PROFIBUS Ident Nr. (Gerätetausch V2862)
47
Starting Phase
48
Data Cycle Time
48
Layer 2 11Bit
48
Universal (L2 11Bit)
49
Universal (L2 11Bit) with COB-ID Used
50
Universal (L2 11/29Bit)
50
Universal (L2 11/29Bit) with COB-ID Used
52
L2 11Bit (Tgl+Fblen)
52
Delivery Status (Factory Setting)
52
Trigger Byte
52
Length Byte
52
Swap Word
52
15 Technical Data
53
Device Data
53
Interface Data
54
16 Commissioning Guide
56
Note
56
Components
56
Installation
56
Dimensional Drawing UNIGATE ® CM - PROFIBUS DP
56
Commissioning
56
Setting the PROFIBUS Address
57
PROFIBUS Connection
58
Setting the Canopen Address and Baudrate
58
Canopen Connection
58
Connection to the Process Device
58
Connecting the Supply Voltage
58
Shield Connection
58
Project Planning
58
Literature
58
17 Servicing
59
Returning a Device
59
Downloading PC Software
59
18 Annex
60
Explanations of the Abbreviations
60
Hexadecimal Table
61
Advertisement
Advertisement
Related Products
DEUTSCHMANN AUTOMATION UNIGATE CM-CANopen
DEUTSCHMANN AUTOMATION UNIGATE CL
DEUTSCHMANN AUTOMATION UNIGATE CX Series
DEUTSCHMANN AUTOMATION UNIGATE CL - Powerlink
DEUTSCHMANN AUTOMATION UNIGATE CL - DeviceNet
DEUTSCHMANN AUTOMATION UNIGATE CX-CANopen-(Mapping) - PROFIBUS DP
DEUTSCHMANN AUTOMATION UNIGATE CL EtherCAT
DEUTSCHMANN AUTOMATION UNIGATE CL-MPI
DEUTSCHMANN AUTOMATION UNIGATE CX-PROFINET 2Port - CANopen
DEUTSCHMANN AUTOMATION UNIGATE CL-FE
DEUTSCHMANN AUTOMATION Categories
Gateway
Microcontrollers
Controller
Network Router
Switch
More DEUTSCHMANN AUTOMATION Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL