Description Of Operation; Warming-Up; Ready State (Ready For Copying) - Toshiba e-STUDIO200L/230/280 SERIES Service Manual

Table of Contents

Advertisement

4.2

Description of Operation

4.2.1

Warming-up

1) Initialization
Power ON
→ Heater lamp ON
→ Set number "1" reproduction ratio "100%" and "WAIT WARMING UP" are displayed
→ Fan motors ON
→ Initialization of scanning system
-
The carriage moves to the home position.
-
The carriage moves to the peak detection position.
-
The exposure lamp is turned ON.
-
Peak detection (white color is detected by the shading correction plate)
-
The exposure lamp is turned OFF.
→ "READY (WARMING UP)" is displayed
2) Pre-running operation
The pre-running operation is started when the temperature of the fuser roller surface reaches a cer-
tain temperature.
→ The main motor is turned ON.
-
Fuser roller rotated
-
Drum rotated
→ Initialization of feeding system
-
Each drawer tray goes up.
→ Pre-running operation stops after five seconds.
3) When the surface temperature of the fuser roller becomes sufficient for fusing,
→ "READY" is displayed.
4.2.2

Ready state (ready for copying)

Buttons on the control panel enabled
→ When no button is pressed for a certain period of time,
- Set number "1" and reproduction ratio "100%" are displayed. Equipment returns to the normal
ready state.
e-STUDIO200L/230/280 GENERAL OPERATION
4 - 2
June 2004 © TOSHIBA TEC

Advertisement

Table of Contents
loading

Table of Contents