4.2
Description of Operation
4.2.1
Warming-up
1) Initialization
Power ON
→ Heater lamp ON
→ Set number "1" reproduction ratio "100%" are displayed (LED "START" blink)
→ Fan motors ON
→ Initialization of scanning system
-
The CIS unit moves to the home position.
-
The CIS unit moves to the peak detection position.
-
The LED of CIS is turned ON.
-
Peak detection (white color is detected by the shading correction plate)
-
The LED of CIS is turned OFF.
→ Ready state (LED "START" ON)
2) Pre-running operation
The pre-running operation is started when the temperature of the fuser roller surface reaches a cer-
tain temperature.
→ The main motor is turned ON.
-
Fuser roller rotated
-
Drum rotated
→ Pre-running operation stops after five seconds.
3) When the surface temperature of the fuser roller becomes sufficient for fusing,
→ Ready state (LED "START" ON)
4.2.2
Ready state (ready for copying)
Buttons on the control panel enabled
→ When no button is pressed for a certain period of time,
- Set number "1" is displayed. Equipment returns to the normal ready state.
e-STUDIO163/203 GENERAL OPERATION
4 - 2
December 2005 © TOSHIBA TEC