Description Of Operation; Warming-Up; Ready State (Ready For Copying) - Toshiba e-STUDIO167 Service Manual

Multifunctional digital systems
Hide thumbs Also See for e-STUDIO167:
Table of Contents

Advertisement

4.2

Description of Operation

4.2.1

Warming-up

1) Initialization
Power ON
o Heater lamp ON
o "Please wait" is displayed
o Fan motors ON
o Initialization of scanning system
-
The CIS unit moves to the home position.
-
The CIS unit moves to the peak detection position.
-
The LED of CIS is turned ON.
-
Peak detection (white color is detected by the shading correction plate)
-
The LED of CIS is turned OFF.
-
The CIS unit moves to the home position.
o "READY (WARMING UP)" is displayed
2) Pre-running operation (Only when the temperature is at 16 °C or less)
The pre-running operation is started when the temperature of the fuser roller surface reaches a cer-
tain temperature.
o The main motor is turned ON
-
Fuser roller rotated.
-
Drum rotated.
o Pre-running operation stops after 15 seconds
3) When the surface temperature of the fuser roller becomes sufficient for fusing,
o "READY" is displayed
4.2.2

Ready state (ready for copying)

Buttons on the control panel enabled
o When no button is pressed for a certain period of time,
- Set number "1" is displayed. Equipment returns to the normal ready state.
e-STUDIO167/207/237
GENERAL OPERATION
© February 2007 TOSHIBA TEC CORPORATION All rights reserved
4 - 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-studio237E-studio207

Table of Contents