Set-Up And Putting Into Operation; General Points - Kessel GTF 50 Hz Series Instructions For Installation, Operation And Maintenance

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 29
5

Set-up and putting into operation

5.1

General points

Please comply with the installation and operating instructions for the relevant engineering chambers (chamber
system) from Kessel AG during setting-up and putting into operation.
To avoid damage to the pump during set-up and in operation, the following points must be taken into account:
Set-up work must be carried out by qualified members of staff and taking the safety regulations into account.
The pump must be examined for any damage before it is set-up.
Where level controls are used, pay attention to the minimum water cover.
Air pockets in the pump housing and pipes must be avoided at all cost (through suitable venting devices or by
tilting the pump slightly).
Protect the pump from frost.
The service room must be designed for the relevant pump. This includes the possibility of setting up lifting gear
to install/dismantle the pump with which the pump's place of installation can be reached safely.
The lifting gear must have a maximum load-bearing capacity that lies above the combined weight of the pump
with fixtures and cables.
The pump's electric cables must be routed in such a way that hazardous operation and simple assembly/
removal is possible.
The electric cables must be correctly fastened in the service room so as to prevent them from hanging around
loosely. A cable bracket must be fitted very 2-3 m depending on the length and weight of the cables.
Dry running is strictly forbidden. We recommend the standard settings of the Kessel level control and
corresponding control units.
Access
steps
Inlet
Set-up and putting into operation
Chamber cover
Upper section
Kette
Öse für
Befestigung
Pumpe
44 / 168
Kette
Cable conduit
Öse für
Befestigung
Chamber
Pumpe
Pressure pipe
connection
Guide pipe
Base elbow
Coupling and
counterflange
Fig. [4]
V 1.0