Putting Into Operation; Preparatory Work - Kessel GTF 50 Hz Series Instructions For Installation, Operation And Maintenance

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 29
of the pumping medium. The switch-off point must be above the upper edge of the pump housing so that no air
pocket can form in the pump, which could necessitate venting of the pump under certain circumstances.
On no account may the level probe with cable be simply thrown into the pumping medium.
5.3

Putting into operation

The chapter contains all the important instructions for the operating staff to be able to put the pump into safe
operation and to operate it subsequently. The following specifications must always be heeded and checked:
Type of set-up
Mode of operation
Minimum water cover / max. submersion depth
These specifications must also be checked following a longer period of standstill and any defects found must be
eliminated.
The operating and maintenance manual must always be stored near the pump or in a specially designated place
where it is always accessible for all members of the operating staff.
To avoid property damage and personal injury when the pump is put into operation, the following points must be
heeded:
The pump may only be put into operation by specially qualified and trained staff, taking the safety notes into account.
All members of staff who work on the pump must have received, read and understood the operating instructions.
Activate all safety devices and emergency-stop circuits before putting the system into operation.
Electrotechnical and mechanical adjustments may only be carried out by specialists.
This pump is only suitable for use under the given operating conditions.
5.4

Preparatory work

The pump was designed and assembled in accordance with the latest technical standards so that it will work reliably
for a long time under normal operating conditions. This requires you to heed all requirements and notes. Small oil
residues in the area of the floating-ring type shaft seal on delivery are harmless; however, they must be removed
before lowering or submersion in the pumping medium.
Please check the following points:
Cable routing – no loops, slightly tautened
Check temperature of the pumping medium and submersion depth
Clean the pump sump
The discharge and suction pipe system must be cleaned and all gate valves opened.
The pump housing must be flooded i.e. it must be completely filled with the medium and not contain any air
whatsoever. Venting can be carried out using suitable venting devices in the system or, if available, through
venting screws on the discharge muff.
Check the accessories, pipe system and suspension device for a tight and correct fit
Check any level controls and/or dry-run protection
Perform an insulation test and check the filling level before putting into operation.
Following a longer period of storage, the product must be cleaned of soiling such as dust and oil deposits before
putting into operation. Check impellers and propellers for smooth running,m check the housing coatings for any
damage.
Check the filling levels (oil etc.) of the individual products before putting into operation and top up as
necessary.
Set-up and putting into operation
46 / 168
V 1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gtk 50 hz series

Table of Contents