Quick Access To "Easy Actions; Factory Settings; Commissioning; Operator Responsibilities - Wilo Control EC-Booster Installation And Operating Instructions Manual

Hide thumbs Also See for Control EC-Booster:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 47
7.5

Quick access to "Easy Actions"

7.6

Factory settings

8

Commissioning

8.1

Operator responsibilities

Installation and operating instructions Wilo-Control EC/ECe-Booster
Commissioning
The following functions can be called up using the Easy Actions menu:
Reset the current error message
NOTICE! Menu point is only shown when an error is present!
Manual operation pump 1
If the operating button is pressed, pump 1 runs.
If the operating button is released, the pump switches off. The last
set operating mode is active again.
Manual operation pump 2
If the operating button is pressed, pump 2 runs.
If the operating button is released, the pump switches off. The last
set operating mode is active again.
Manual operation pump 3
If the operating button is pressed, pump 3 runs.
If the operating button is released, the pump switches off. The last
set operating mode is active again.
Pump 1 switch off.
Corresponds to the "off" value in menu 3.02.
Pump 2 switch off.
Corresponds to the "off" value in menu 3.03.
Pump 3 switch off.
Corresponds to the "off" value in menu 3.04.
Automatic mode, pump 1
Corresponds to the "Auto" value in menu 3.02.
Automatic mode, pump 2
Corresponds to the "Auto" value in menu 3.03.
Automatic mode, pump 3
Corresponds to the "Auto" value in menu 3.04.
To reset the switchgear to the factory settings, contact customer service.
NOTICE
Observe additional documentation
Carry out the commissioning measures in accordance with the installation and oper-
ating instructions for the overall system!
Observe the installation and operating instructions for the connected products
(sensors and pumps) as well as the system documentation!
▪ Provide installation and operating instructions at the switchgear or at a place specially
reserved for it.
▪ Make the installation and operating instructions available in a language the personnel
can understand.
▪ Make sure that the installation and operating instructions have been read and under-
stood by all personnel.
▪ The installation site of the switchgear is overflow-proof.
▪ The switchgear is properly fused and earthed.
▪ Safety devices and precautions (incl. emergency off) for the entire system are switched
on and have been checked for problem-free operation.
▪ The switchgear is suitable for use under the specified operating conditions.
en
67

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Control EC-Booster and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Control ece-booster

Table of Contents