Figure 14. Load Cells Connection 6 Wires With Active Barrier D1063S - Logic DLC NET Series Use And Maintenance Manual

Load cells digital interface with indicator
Table of Contents

Advertisement

USE AND MAINTENANCE MANUAL – DLC

Figure 14. Load cells connection 6 wires with active barrier D1063S

3.5.4
Connection to the
junction box
Table 5. Connection to the junction box JBOX-V3(EX1)
Terminal TB5
1
2
3
4
5
6
7
TB1 – TB2
TB3 – TB4
1
2
3
4
5
LOGIC S.r.l. - M0145Db.docx
Mod. L0006A01 of 30/05/2016
NET
Series
The instruments of DLC
parallel. In this case it is possible to use the junction box mod. JBOX-V3 (or JBOX-
V3-EX1 in areas with potentially explosive atmospheres) for connecting up to 4
load cells and go out with a single CAB-TS6 extension cable. The connections are
shown in Table 5 and in Figure 15.
Table of signal and color code cable
Extension cable CAB-TS6
Signale
Description
GND / Shld
+Exc
+S
- Exc
- S
+ Sig
- Sig
Cavi celle di carico
Signale
Description
+ Exc
- Exc
+ Sig
- Sig
GND / Shld
NET
series support up to 4 cells, that can be connected in
cable shield
+ excitation
+ sense
- excitation
- sense
+ signal
- signal
+ excitation
- excitation
+ signal
- signal
cable shield
Installation
Color Code
GND / Shld
Red
Green
Blue
Grey
White
Yellow
Color Code
Red
Black
Green
White
GND / Shld
Page 23 of 78

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLC NET Series and is the answer not in the manual?

Related Products for Logic DLC NET Series

This manual is also suitable for:

Dlc net-wmDlc net-din

Table of Contents

Save PDF