4
Repairing the Pump
7 Unclip the power supply light pipe from the power supply
and pull out the coupler.
Coupler
(2)
Light pipe
9 Place the new power supply into the instrument and fix
the two screws at the back plane.
150
(1)
8 Lift the power supply out of the unit.
10 Install the coupler onto the power supply switch and clip
the light pipe back onto the coupler.
Coupler
(2)
Light pipe
1200 Series QP Reference Manual
(1)