Equipment Frame; Steering - Husqvarna R419TsX AWD Workshop Manual

Table of Contents

Advertisement

4. To balance the blades put a rod horizontally in a
vise.
5. Put the center hole of the blade on the end of the
rod.
6. If the blade rotates, remove material with the file at
the end of the blade that points down. Do this until
the blade is correctly balanced.
7. Attach the blades.

9.7 Equipment frame

9.7.1 To remove the equipment frame
To attach the cutting deck on
1. Do the steps 1–7 in
page 11 .
2. Remove the equipment frame cover. Refer to
remove and install the equipment frame cover on
page 25 .
3. Remove the equipment belt. Refer to
equipment belt on page 69 .
4. Remove the front wheels. Refer to
and assemble the wheel hub on page 30 .
5. Put support below the front axle on both sides of the
product.
914 - 003 - 28.03.2019
6. Remove the pin to remove the chain from the
7. Remove the master link (A) on the cutting height
To
8. Remove the screws (A) on the weight transfer stays
To replace the
To disassemble
9. Remove the rear joint screws (B) of the equipment
10. Assemble in opposite sequence.

9.8 Steering

9.8.1 To examine and adjust the steering cables
The tension of the steering cables can decrease after a
period of time. This causes the adjustment of the
steering to change.
Examine and adjust the steering as follows:
equipment frame.
chain.
on the two sides of the product.
B
frame behind the front wheels.
A
A
Repair instructions - 63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R420tsx awd

Table of Contents