Re-Torque Wheel Flange Nuts - Norwood Kwik-Till HSD2500 Operator's Manual

3-section drawn high speed disk
Table of Contents

Advertisement

First 10 Hours Of Operation

Re-Torque Wheel Flange Nuts

1. Unfold the machine into the Field Position.
Till Folding & Unfolding" on page 4-11)
2. Lower the disks to the ground by retracting the Front
Wheel Cylinders A and Rear Roller Cylinders B .
(See Fig. # 5-1)
Fig. # 5-1 Lower Disks to the Ground
3. Relieve all the hydraulic pressure by placing the tractor
SCV levers to the FLOAT POSITION
running for the Main Frame Lift & Wing Fold cylinders.
4. The machine should now be in the "Field Lowered Po-
sition"
(See Fig. # 3-53)
5. Re-torque wheel flange nuts A (In A Diagonal Pattern)
at 10 hour intervals or (daily). If bolt torque is stable,
check at 50 hour intervals or (weekly).
10
50
350 ft-lbs
475 N-m
(See "Kwik-
A
B
with engine
.
5 - MAINTENANCE
Fig. # 5-2 Wheel Flange Nut Tightening Sequence (Diago-
Fig. # 5-3 Wheel Flange Nut Locations 25', 30' 35', 40', &
5-6
1
8
10
6
3
4
5
9
7
2
nal Pattern)
A
A
45'

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents