Manual Depth Control Procedure - Norwood Kwik-Till HSD2500 Operator's Manual

3-section drawn high speed disk
Table of Contents

Advertisement

Install the Hitch Pin
(See Fig. # 4-18)
Fig. # 4-18 Adjusting The Depth Stops Step # 3

Manual Depth Control Procedure

1. Transport the Kwik-Till onto level ground.
2. Unfold the Kwik-Till to the "Field Raised Position".
"Kwik-Till Folding & Unfolding" on page 4-11)
Fig. # 4-19 "Field Raised Position"
4 - WORKING OPERATIONS
B
, & secure with the Hair Pin
D
C
B
E
A
.
3. Make sure that the Rear Roller
B
Cylinders
are extended, the disks will be completely off the ground.
(See Fig. # 4-20)
A
Fig. # 4-20 "Field Raised Position"
4. Make the necessary adjustments with the "Depth Stops"
A good starting setting is to a depth of 2 in - 3 in (51 mm
- 76 mm) in spring and 3.5 in - 4.5 in (89 mm - 114 mm)
in fall.
(See "Table: Depth Stop Adjustment" on page 4-7)
(See
5. Fully retract the Rear Roller
B
inders
. The cylinders will bottom out on the Depth
C
Stops
, and the disks will engage the soil at the set
depth.
(See Fig. # 4-21)
Fig. # 4-21 Fully Retract the Rear Roller & Front Wheel
4-9
A
and Front Wheel
are fully extended. When these cylinders
A
B
A
and Front Wheel Cyl-
Cylinders

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents