Landoll BRILLION TURFMAKER II SL Operator's Manual page 46

Table of Contents

Advertisement

ASSEMBLY
30. Assemble onto the Rear Seed Box Seed Shaft the
Seed Rate Adjusting Screw, 1-8 Nut, Bearing, Seed
Rate Adjusting Nut and 1/2-13 Locknut. Place
Bearing between Flangettes and attach to Bearing
Carrier with 5/16-18 x 1 Bolts, Lock Washers and
Nuts. See Figures 2-42and 2-43.
Figure 2-42: Rear Box Seed Rate Aduster
2-30
Figure 2-43: Rear Box RH End Assembly
31. Adjust Front and Rear Seed Box Seed Meters so that
all the Seed Meters are closed. Perform Seed Meter
"0" Adjustment in "Seed Meter Adjustment" on
page
4-8.
32. Install Front Seed Shaft Coupler and tighten Rear
Seed Box Feed Roll Coupler Assembly Set Screws
against the Seed Shaft and tighten Jam Nuts against
Feed Roll Coupler.
33. On the side of the Transmission by the Electric
Clutch, position the Idler Sprocket so that it applies
tension to the #40 Drive Chain. Tighten the Idler
Sprocket Nut. See "Chain Tension" on page 4-6.
34. Install Transmission Shield.
35. 8 and 10Ft Seeders, Install RH and LH Light
Brackets.
36. 12Ft Seeders, Install Turnbuckles to Double Box RH
Support, Double Box Center Bracket and LH Double
Box Mounting Plate.
37. Connect Acre Meter and Warning Lamps.
9K998

Advertisement

Table of Contents
loading

Table of Contents