X1000Aj/X33Jp With Lithium-Ion Battery Pack - JLG X1000AJ Operation And Safety Manual

Table of Contents

Advertisement

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
Component Maintenance Intervals - X1000AJ/X33JP - with Lithium-Ion Battery Pack
Table 6-11.
Component
Hydraulic Oil
Hydraulic Oil Filter
Articulated Joint Points
Battery (Auxiliary)
Reduction Gear Oil
Machine
Extension Arm Internal Sliding Ring (if equipped) Check Wear
Turntable Bolt Tightening
Platform Mount Pin Nuts
Extension Ropes and pulleys (if equipped)
*
1st time interval then per chart thereafter
** At least every 3 months or 1000 hrs. of operation
*** At lease every 5 years or 2000 hrs of operation. Check every year. If torque is not correct, replace the nuts with new nuts of same specification.
Install dry without using grease or oil to specified torque.
**** At least once a year. Replace nuts if not properly torqued.
3121783
Operation
Check Level
Replace
Replace Cartridge
Grease
Check
Check Level
Replace
General Periodic Check
Replace
Check
Check torque 148 ft. lb. (200 Nm)
Check Wear
Replace
Pre-Start As Needed
10
Hours
50
100 250 500 1000 2000
•*
•*
•*
•*
•****
•**
SERV...
•*
•*
•***
6-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

X33jp

Table of Contents