3.2.2 To remove the accessories from the indoor unit
3.2.3 To handle the indoor unit
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
a Shut-off valve with integrated filter
b Safety valve (connection parts for mounting on top of brine level vessel included)
c Brine level vessel
d Remote outdoor sensor (with installation manual)
e Cable for remote outdoor sensor (40 m)
f O-rings (spares for hydro module shut-off valves)
g Tundish (to mount onto the pressure relief valve discharge pipe)
h Energy label
i General safety precautions
j Addendum book for optional equipment
k Installation manual
l Operation manual
Mind the following guidelines when handling the unit:
>200
kg
▪
The unit is heavy. At least 2 persons are needed to handle it.
▪
Use a trolley to transport the unit. Make sure to use a trolley with a sufficiently
long horizontal ledge, suitable for transportation of heavy appliances.
▪
When transporting the unit, keep the unit upright.
▪
Use the handles at the back to carry the unit.
▪
Remove the hydro module when you want to carry the unit up or down
staircases. See
"6.2.3 To remove the hydro module from the unit"
more information.
▪
It is recommended to use lifting straps to carry the unit up or down staircases.
a
b
c
1×
1×
1×
e
g
f
1×
4×
1×
i
j
k
1×
1×
1×
3
About the box
|
d
1×
h
1×
ENERG
ENERG
Y
IJA
Y
IJA
IE
IA
IE
IA
l
1×
4
[
57] for
Installer reference guide
17