8
|
Electrical installation
Installer reference guide
92
2
1
X2M
14a 21
b
a
2
A4P
Y1
YC
1
2
2×
1×
1×
a
YC
Y1
3 Fix the cable with cable ties to the cable tie mountings.
1+2
Wires connected to the alarm output
3
Wire between the installer switch box
and main switch box
a
Installation of EKRP1HBAA is
3
required.
b
Cable sleeve (field supply)
1×
1×
X2M
3
2
1
b
b
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12