To perform a current sensor phase check
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598592-1A – 2019.12
Pump test
INFORMATION
Make sure that all air is purged before executing the test run. Also avoid disturbances
in the water circuit during the test run.
Shut off valve test
Diverter valve test (3-way valve for switching between space heating and
tank heating)
Bivalent signal test
Alarm output test
C/H signal test
DHW pump test
Backup heater phase 1 test (3  kW capacity, only available when current
sensors are used)
Backup heater phase 2 test (3  kW capacity, only available when current
sensors are used)
Backup heater phase 3 test (3  kW capacity, only available when current
sensors are used)
Brine pump test
To make sure that the current sensors measure the current of the correct phase,
perform a current sensor phase check. This can be done using the backup heater
actuator tests.
Note: Make sure that Power
sensor ([4‑08]=3). See
1 Set the user permission level to Installer. See
user permission
level" [
2 Go to [A.2.C]: Commissioning > Actuator test run >
Backup heater phase 1
3 Select OK to confirm.
Result: The Backup heater phase 1 test run starts. The
current sensor values first show the values without the backup
heater. After 10 seconds, one of the 3 values will change due to
the backup heater becoming active on that phase. Remember
or write down the current sensor of which the value increases.
4 Go to [A.2.D]: Commissioning > Actuator test run >
Backup heater phase 2
5 Select OK to confirm.
Result: The Backup heater phase 2 test run starts. The
current sensor values first show the values without the backup
heater. After 10 seconds, one of the 3 values will change due to
the backup heater becoming active on that phase. Remember
or write down the current sensor of which the value increases.
6 Switch the terminals of the current sensor wires according to
the table below. Perform steps 1 to 6 until no more wires have
to be switched.
consumption
"Power consumption
control" [
4
 128].
11
Commissioning
|
control is set to Current
4
 190].
"To change the
Installer reference guide
205